Hotel Falkensteiner

Auftraggeber:
Margareten Liegenschaftsverwertungsges.m.b.H
Planungsbüro:
Michaeler & Partner Wien, DI Thomas Gratzer
Gewerke:
Heating, cooling, ventilation and sanitary systems including MSR
Durchführungszeitraum:
Nov. 2012 – Oct. 2013

Projektbeschreibung:

A 4 * hotel with 195 rooms & amp; 4 seminar rooms. Ventilation, heating & amp; The rooms are cooled via Magic Air outlets. The sanitary equipment was realized with Dornbracht. The greatest challenge was to integrate the fire smoke dilution systems into the old building.


Technische Angaben:

  • Heating capacity: 1,200 kW
  • Cooling capacity: 600 kW
  • Ventilation: 8 systems with a total of 50,000 m3 / h (comfort ventilation), 40,000 m3 / h garage smoke extraction, 5 fire smoke dilution systems for air lock smoke extraction H6029-10
  • Sanitary: 6000 l hot water boiler, wet riser pipe according to TRVB 128 S.