Molin-Logo weiß

MOLIN

Bürokomplex Gate 2

Auftraggeber:
INV Totalunternehmer GmbH - BAI
Planungsbüro:
ZFG - Hr. Ing. Rechberger
Gewerke:
Heating, air-conditioning, ventilation and sanitary installation + insulation + instrumentation and control engineering + cooling ceilings
Durchführungszeitraum:
December 2013 - January 2015

Projektbeschreibung:

An office complex made up of two connected component buildings, situated opposite the Gasometer shopping and entertainment centre and the subway stop of the same name. During development, we focused particularly on sustainability and high quality. The entire building was consigned to the new tenant, the municipal housing organisation Wiener Wohnen, who are using this location as their new headquarters.


Technische Angaben:

  • 9 ventilation units
  • 3 refrigeration machines
  • 4 heat exchangers
  • 1200 radiators
  • 350 component activation manifolds
  • 5000 m² acoustic and cooling ceilings
  • Heating capacity: 1,500 kW
  • Cooling capacity: 2,500 kW
  • Ventilation: 170,000 m³/h
  • Smoke: 210,000 m³/h